Infrastructure Systems for Public Safety LMR and Microwave Systems

Infrastructure Systems for Public Safety LMR and Microwave Systems

Infrastructure Systems for Public Safety LMR and Microwave Systems Throughout the Mid-Atlantic, Midwest, and Eastern US Turnkey development of raw land tower sites, equipment colocations, and custom infrastructure system installations.  Site development services routinely begin with regulatory compliance and engineering design, followed by self-performing on-site civil construction, tower erection, transmission line, and antenna installations. What…

Self-Supporting Tower Sites

Self-Supporting Tower Sites

Self-Supporting Tower Sites Achille, OK, and Truman Dam, MO Turnkey Construction of Achille 320’ Self-Supporting Tower Site and Truman Dam 400’ Self-Supporting Tower Site.  Ancillary work included fiber optics, tower removal, emergency power systems, and Microwave and Land Mobile Radio system installations. What Our Clients Say Hear directly from those who’ve experienced the JG difference…

Self-Supporting Tower and Water Tank Modifications

Self-Supporting Tower and Water Tank Modifications

Self-Supporting Tower and Water Tank Modifications Ridge, MD + Prince Frederick, MD Turnkey construction of Ridge Substation, Self Supporting Tower Site, and Colocation of antenna systems on Prince Frederick, MD public water tank.  Ancillary work included coax duct bank, tower removal, emergency power systems, water tank modifications, and Microwave and Land Mobile Radio system installations. …

Soil Nail and Shotcrete Wall

Soil Nail and Shotcrete Wall

Soil Nail and Shotcrete Wall Middletown, PA JG was instrumental in developing the soil nail and shotcrete wall concept required to retain the earth from a new roadway embankment at an existing Facility in Middletown, Pennsylvania.  JG constructed a 500-foot long, 10,500 square-foot soil nail and shotcrete wall in order to re-align a service road…

Soldier Pile and Lagging Wall

Soldier Pile and Lagging Wall

Soldier Pile and Lagging Wall South McKeesport, PA JG designed and constructed a soldier pile and pre-cast lagging retaining wall at the South Allegheny Elementary School in McKeesport, Pennsylvania.  The retaining wall was designed to provide global stability to the existing fill slope that was previously constructed for the building pad.  The wall included a…

Hydraulic Press Foundations and Wash Line Pits

Hydraulic Press Foundations and Wash Line Pits

Hydraulic Press Foundations and Wash Line Pits Cannonsburg, PA JG designed and installed multiple cast-in-place concrete wash line pits. The work included geotechnical design parameters and detailed structural designs of the pits and all steel embedments, structural members, and steel plate covers for plant traffic.  Especially challenging in this facility are the high variables and difficult subsurface…

CMM and IMT Vertical Turret Lathe Machinery Foundations

CMM and IMT Vertical Turret Lathe Machinery Foundations

CMM and IMT Vertical Turret Lathe Machinery Foundations Kentucky JG designed and installed single and multi-level foundations for this state-of-the-art equipment in very poor soil conditions.  Deep excavations required underpinning of existing adjacent column footings, along with structural excavation shoring systems consisting of drilled-in soldier piles with wood lagging.  The large equipment foundation supports consisted…

Micropile Building Foundations

Micropile Building Foundations

Micropile Building Foundations Allentown, Pennsylvania JG designed and installed 114 micropiles to support a new office building at the Waterfront Development in Allentown, Pennsylvania.  The piles were designed for 300 kips in compression and averaged approximately 70 feet deep.  Micropiles were required for foundation support for this project due to the existing fill materials at…

Conveyor System Foundations

Conveyor System Foundations

Conveyor System Foundations Hill, PA JG installed the foundation for a state-of-the-art conveyor system at the main loading dock area of the facility.  The work required concrete demolition and excavation inside the existing facility.  Work had to be performed using strict controls for dust containment and occurred during the COVID-19 pandemic, both of which added…