CMM and IMT Vertical Turret Lathe Machinery Foundations

Kentucky

JG designed and installed single and multi-level foundations for this state-of-the-art equipment in very poor soil conditions.  Deep excavations required underpinning of existing adjacent column footings, along with structural excavation shoring systems consisting of drilled-in soldier piles with wood lagging.  The large equipment foundation supports consisted of conventional spread footings supplemented with twenty-two (22) each, 70’ deep helical piles for the heavy point loads.

What Our Clients Say

Hear directly from those who’ve experienced the JG difference firsthand.