JG installed the foundation for a state-of-the-art conveyor system at the main loading dock area of the facility. The work required concrete demolition and excavation inside the existing facility. Work had to be performed using strict controls for dust containment and occurred during the COVID-19 pandemic, both of which added further challenges to the project. All work required tight scheduling with the Operations Manager to maintain access for the facility to operate in conjunction with our work.