Soldier Pile and Lagging Wall
South McKeesport, PA
JG designed and constructed a soldier pile and pre-cast lagging retaining wall at the South Allegheny Elementary School in McKeesport, Pennsylvania. The retaining wall was designed to provide global stability to the existing fill slope that was previously constructed for the building pad. The wall included a total of 38 soldier piles drilled 50 feet deep, one (1) row of permanent anchors, and 4,800 square feet of pre-cast concrete lagging. The work also included drainage and earthwork to restructure the slope.
What Our Clients Say
Hear directly from those who’ve experienced the JG difference firsthand.